The harbor is in the Rachel Carson National Wildlife Refuge. Most of the work is funded by the Army Corps of Engineers, which is responsible for maintaining navigable waters.īut several factors complicated the last dredging of Wells Harbor. Army Corps of Engineers, a breakwater was built perpendicular to the shore to redirect the tide and prevent coastal erosion. When Wells Harbor was built in the 1960s by the state and the U.S. Now, town officials say the sandbar needs to go. The sandbar remained because environmental groups argued that it provided habitat for wading birds and helped to protect the marsh on the inside of the harbor. The last major dredging was in 2000, when 180,000 cubic yards of sand were removed to create mooring space for 150 boats and improve navigation. Five were lost last year, and a dozen will be lost this year, he said. The last dredge caused a major environmental battle but harbormaster Roland “Chick” Falconer said moorings are being lost because of a growing sandbar in Wells Harbor. WELLS (AP) – Officials concerned about a buildup of sand are exploring dredging inside the harbor for the second time in five years.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |